-
Water Source
-
Concrete Stoop
-
Grading
-
Grading
-
Grading
-
Grading
-
Grading
-
Grading
-
Brush Pile
-
Final Framing
-
Eave Returns
-
Eave Returns
-
Steel Paneling
-
Purlins all installed
-
Doors Framed
-
Trusses Installed
-
Gable Overhangs
-
Trusses Installed.
-
Lumber Pile
-
Sat Aug 30 2008